if the duration of a predecessor activity is 8 days and the duration of the successor activity is 8 days and the relationship is ss with a 5 day lag, what is the duration of the combination of the two activities? group of answer choices eight hours thirteen days eleven days twenty one days

Respuesta :

Otras preguntas

why was Voltaire's novel Candide banned in both Europe and the unites States
Where was Abraham Lincoln shot?
Solve the equation for y. 8x – 9y = 11
what does pétanque mean in French
What is the element Ar classified as in the periodic table?
Which terms best describe the Greek city-state of Athens? A. militaristic and aggressive B. unenlightened and regressive C. educated and progressive D. tyrannic
Does the universe ever stop ?
Julie had a box of paper clips that have a mass of 1 gram each. the entire box has a mass of 1 kilogram . how many paper clips are in the box?
Which of the following was a similarity between classical Mesoamerican and South American religions? A)They were not separated from civilizations’ governments.
why was Voltaire's novel Candide banned in both Europe and the unites States