When fitting a line to predict US COâ‚‚ emissions (tonnes per person) by year (1980-2010) and observing the point in 2003, does this point have an outlier or high leverage? a) Outlier b) High leverage c) Both outlier and high leverage d) Neither outlier nor high leverage