solizj3296 solizj3296
  • 04-09-2018
  • Mathematics
contestada

Kristina recently hired a contractor to do some necessary work. On the final bill, Kristina was charged a total of $765. $405 was listed for parts and the rest for labor. If the hourly rate for labor was $80, how many hours of labor was needed to complete the job?

Respuesta :

TheBreeze
TheBreeze TheBreeze
  • 04-09-2018

405 + 80t = 765

80t = 360

t = 4.5

It took the laborer 4.5 hours

Answer Link

Otras preguntas

which stage of a river development is characterized by flat floodplains
Round 125 458 to the nearest hundred thousand
What times 57 equals 570
Does any body know 2v+7=3
Sid wrote 541,309 on his paper. Using words and numbers explain how the number would change if he switched the digits in the hundred thousands and tens place
Write an equation. Then solve the problem.Arturo built 3 sandcastles with 6 towers each. Paco built 5 sandcastles with 4 towers each. Who built more towers? How
Please help me on these questions, Thanks  29. Express six and three-fifths as an improper fraction.  30. Find the improper fraction that is equivalent to eight
How does the suffix change the meaning of the base word in instruction
How do you show your work for 0.054 divided by 0.72
If something is made of atoms, it must be ____.