Respuesta :
Answer:
 a)  1.653Ă10š² ft¡lb
 b) about 97,230
Step-by-step explanation:
Work
The work is calculated by multiplying the weight of material in the pyramid by the height to which it is raised. On average, the material is raised to the height of the centroid of the pyramid, which is 1/4 of its height from the base.
The weight of material is calculated as the product of the volume of the pyramid and the density of the material.
 work = (volume) à (density) à (height of centroid)
 = (1/3)b²h à (density) à h/4
 = (1/3)(756 ft)²(481 ft) à (150 lb/ft³) à (481 ft)/4
 = (1/12)(756²)(481²)(150) ft¡lb
 = 1.6528892562Ă10š² ft¡lb
 work â 1.653Ă10š² ft¡lb
__
Laborers
The work output of each laborer is estimated to be ...
 (10 h/day)(340 day/yr)(20 yr)(250 ft¡lb/h) = 17,000,000 ft¡lb
Then the number of laborers required is ...
 # laborers = (total work) / (work per laborer)
 # laborers = (1.653Ă10š² ft¡lb) / (1.7Ă10⡠ft¡lb/laborer) â 9.723Ă10â´ laborers
About 97,230 laborers were needed to construct the pyramid.