bonefacemchemo
bonefacemchemo bonefacemchemo
  • 01-04-2021
  • Business
contestada

explain the difference between production control and production planning​

Respuesta :

769245 769245
  • 01-04-2021

Answer:

Planning of the manufacturing process is deciding in advance what to do, how to do, when to do it and who is to do it. Controlling of the manufacturing process measures the digression of actual performance from the standard performance and takes corrective actions.

Explanation:

Answer Link

Otras preguntas

what are some reasons for limiting authority
Which of the following is equivalent to 3a + 4b – (–6a – 3b) ? A. 16ab B. –3a + b C. –3a + 7b D. 9a + b E. 9a + 7b
How can b^2+9b+14 be re-written?1) (b+7) (b-7)2) (b-7) (b-2)3) (b+7) (b-2)4) (b+7) (b+2)
How can b^2+9b+14 be re-written?1) (b+7) (b-7)2) (b-7) (b-2)3) (b+7) (b-2)4) (b+7) (b+2)
name the four southwestern states where many Mexicans lived originally or settled
what colors are birds are attracted 2
What organs work with skin?
What is 68 divided by the square root of 4
how do u divide 16 by 3/5
What is 68 divided by the square root of 4