fosterjoseph5716 fosterjoseph5716
  • 02-05-2021
  • Mathematics
contestada

If six girls can finish sweeping the floor of a hall in 45mins,how long will the same work take ten girls to do

Respuesta :

cmckee660
cmckee660 cmckee660
  • 02-05-2021

Answer:

15 minutes i think

Step-by-step explanation:

45÷6=7.5

meaning 7.5 minutes per girl

so 4 girls would be 30 minutes of work

so 45-30=15

Answer Link

Otras preguntas

Which position is considered a cross between a receiver and a lineman because players in this position run, block and receive passes?.
What is the sum of 10.8 + 42%? 52 52 53 53
What is added to make solid ice change to liquid water and then to gaseous steam?.
Describe the ways in which rhythm is formed in poetry
How to cultivate land more effectively
A fold is a ------------ in rock, and a fault is a -------------- in rock. break bend gap
Magnetite and hematite occur together in layered sedimentary rocks called.
Throughout history, microorganisms, such as yeasts, have been used in the processes for making cheese and bread. These microorganisms use anaerobic respiration
Nick recently started a landscaping company. He began with 3 clients. Thanks to word-of-mouth referrals, his clients double each month. How many clients will Ni
I need help with this question