Designing 100 pieces of a PCB, engineer's find that the batch has a M.A.D of (1.5) . A second batch with 100 pieces has a M.A.D of (0.20) Which batch has less variability and what does it mean for the production engineer's?
M.A.D(Mean Absolute Deviation)