8 students take 18 hours to construct a raft.
If the raft needs to be completed 12 hours earlier, calculate how many more students are needed.

Respuesta :

devishri1977
devishri1977 devishri1977
  • 04-08-2021

Answer:

16

Step-by-step explanation:

Students                      8       x

Time taken (hours)     18     18 - 12 = 6

If number of students increases, the work will completed in less hours.

So inverse proportion

[tex]x =\frac{18*8}{6}=3*8 = 24[/tex]

Additional students required = 24 - 8 = 16

Answer Link

Otras preguntas

Is rock solution because it is made up of minerals, water, stone, and dirt?
HELP PlEASE!!!!!! 1. Solve, using linear combination. 3x – y = 4 2x + y = 6 2. What is the y-coordinate of the solution to the system of equations? 5x - y
what is 3/5 of 60 students?
explain how the bonding properties of carbon atoms result in the large variety of carbon-based molecules in living things
is 6/8 greater than 6/7
When scientists analyze a rock for its age they are able to determine what events occurred and how it affected life. What do scientists deduce from this? A. ove
Is Siberia limited or unlimited government?
a quilt pattern makes a quilt that is 48 inches by 60 inches.if you want to make the quilt 1/3 smaller how wpuld you find the new dimensions? what would the new
Rachel jogged along a trail that was 1 fourth of a mile long . she jogged along a trail 8 times. how many miles did she jog.
what three countries were annexed by the soviet union in 1939 because of their location