hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

what evidence is there to show that changing sand to glass is a chemical change
how do you write 2,049,000 in expanded form
what is a tendon and a ligament
does 8 have more factors than 9
Is 5/11 greater than 1 / 2?
a cube has surface area 6534 square feet. what is the volume
what's the opposite of applaud
3.7 times 9.4 show work
What is 25% of 6??? Is it 1.5?
What are two numbers that add up to 70 without regrouping?