bumpadump27 bumpadump27
  • 05-07-2022
  • Computers and Technology
contestada

Which is a graphical tool used to represent task duration but not sequence?
A. CPM
B. Network Diagram
C. Pert
D. Gantt

Respuesta :

Martebi
Martebi Martebi
  • 06-07-2022

CPM is a graphical tool used to represent task duration but not sequence.

What is the CPM used for?

The critical path method (CPM) is known to be a method  where a person identify tasks that that are essential for project completion and know its scheduling flexibilities.

Therefore, CPM is a graphical tool used to represent task duration but not sequence.

Learn more about graphical tool from

https://brainly.com/question/12980786

#SPJ1

Answer Link

Otras preguntas

The most populous city in Australia is _____.
Vaporization takes place when a solid is changed to a gas. True False
What is the wavelength (angstroms) of a photon that has an energy of 4.38 x 10-18 j?
When government inspectors investigated the claims made by Upton Sinclair in The Jungle, they found that Sinclair had dishonestly represented the conditions in
what is the measure of the missing angle
NEEED HELP on last question
which effect did the Gulf of Tonkin Resolution have on America's role in Vietnam War
Simplify Z^5x^2/z^4x^6
which type of due process means the government has to have fair legal procedures
Secondary seismic waves (s waves) ______. are the slowest seismic waves travel through solids, liquids, and gases