Preparing an estimate for a construction job, a carpenter assumes about a 13% waste factor. If the finished project contains 1280 linear feet of boards, how many linear feet should the carpenter order? (Hint: If the waste is 13%,then the finished product is 100% - 13% or 87% of the total order.)