A construction company builds a concrete ramp as shown. What volume of concrete is needed to form the ramp?

360 cubic feet
600 cubic feet
700 cubic feet
720 cubic feet

A construction company builds a concrete ramp as shown What volume of concrete is needed to form the ramp 360 cubic feet 600 cubic feet 700 cubic feet 720 cubic class=

Respuesta :

10 x 12 x 6 = 720

720/2 = 360 cubic feet needed

I think it's 360 cubic feet