___ is a contract model where the contractor who will eventually build the project is on board at or near the beginning of design and continues to work as a team member with the Designer and owner throughout the project.
A) Integrated Project Delivery (IPD)
B) Design-Build (DB)
C) Construction Management at Risk (CM-at-Risk)
D) Design-Bid-Build (DBB)