When a promisor announces before the time for his performance is due that he will not perform, he is said to have committed a(n) _____?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 16-12-2017

Answer – An anticipatory breach (or repudiation)

 

A promisor may be required to give reassurance that contractual performance will be forthcoming when there is reasonable ground for insecurity. If no adequate assurances are forthcoming, anticipatory breach may be assumed, an announcement by the promisor before the time for his performance is due that he will not perform an outright repudiation (anticipatory breach)

Answer Link

Otras preguntas

Identify the process that represents how organisms grow and replace old or damaged cell.
Name the countries that border Nepal and Bhutan
How did the Arabian Peninsula’s location affect ability to trade? A.Trade was quite widespread because agriculture was so expansive. B.The location was so isol
How many different arrangements of the letters in the word power
how did Hollywood ten demonstrate the nations anti-communist hysteria
solve for y by using elimination -4x + 8y = 10 7x + 9y = 19
find the sum to the equation of:
Which of the lines from the poem How do I love thee? (Sonnet 43) contains a change in intonation? A. I love thee freely, as men strive for Right; B. How do I lo
How to balance chemical equations?
Which point of view allows the narrator to see into the heart and mind of only one character at a time? A. first-person B. third-person limited C. third-person