pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

What were the British and French military trying to protect Europe from?
During the election campaing of 1916,Woodrow Wilson promised
How many total centimeters of rain fell? Enter your answer as a mixed number in simplest form
Which statement accurately describes how historical society influence the development of democracy A-Feudal states in Europe promoted ideas based on the impor
What technology will examine the current state of a network device before allowing it can to connect to the network and force any device that does not meet a sp
1. Why does putting baking soda on a fire put it out? A.The baking soda cools the fire off so it can’t burn. B. CO2 gas is produced reducing the amount of heat.
The table shows how much Jillian’s mother will donate
What role did the god Osiris play in Egyptian religious belief
seth has 23 u.s stamps and 14 foreign stamps he has 27 u.s coins ans 11 foreign coins what fraction of seths collection is from the u.s write the fraction in si
Will give brainliest answer!